SMC Networks SMC8024L2 User Manual Page 35

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 34
E
QUIPMENT
C
HECKLIST
3-3
Equipment Checklist
After unpacking the TigerSwitch 10/100/1000 unit, check the contents to
be sure you have received all the components. Then, before beginning the
installation, be sure you have all other necessary installation equipment.
Package Contents
TigerSwitch 10/100/1000 unit, SMC8024L2
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
Power cord—either US, Continental Europe or UK
RS-232 console cable
This Installation Guide
Installation and Management Guide CD
SMC Warranty Registration Card—be sure to complete and return to
SMC
Optional Rack-Mounting Equipment
If you plan to rack-mount the switches, be sure to have the following
equipment available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
Page view 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 79 80

Comments to this Manuals

No comments